Free Shipping on orders over $500
Results for “topcon”
Found 0 results
How to Calculate Pipe Grade for Sewer Installation
How to calculate minimum pipe grade for sewer installation. Grade formulas, code minimums, and how to enter grade into Topcon TP-L6G and Spectra DG813 pipe lasers.
How to Calibrate a Rotary Laser Level: Field Check & Service Guide
How to check and calibrate a rotary laser level in the field. Two-peg test method for Topcon RL-H5A, Spectra LL500, Leica Rugby. When to send in for factory calibration.
How to Clean and Maintain a Total Station
Step-by-step guide to cleaning and maintaining a total station in the field and shop. Lens cleaning, axis checks, tribrach maintenance, and service interval recommendations for Topcon, Trimble, Leica, and Sokkia total stations.
How to Extend Battery Life on Survey Equipment in Cold Weather
How to maximize battery life on total stations, GPS rovers, and data collectors in cold weather. Storage, charging, field handling, and backup power strategies for Trimble, Topcon, Leica, and Spectra survey instruments.
How to Find Northing and Easting Coordinates on a Job Site
How to find northing and easting coordinates on a construction job site using a total station, GPS rover, or from plan sheets. Understanding State Plane coordinates, local systems, and coordinate display on Trimble, Topcon, and Leica equipment.
How to Interpret and Export Data from a Survey Data Collector
Guide to interpreting and exporting survey data from a field data collector. Covers point files, job structure, coordinate systems, raw observations, and export formats for Trimble, Topcon, and Leica.
How to Lay Out a Control Traverse on a Construction Site
Step-by-step guide to establishing a control traverse on a construction site using a total station. Traverse design, field measurement, closure check, and control hub placement for Topcon, Trimble, and Leica instruments.
How to Perform a Two-Peg Test on an Optical Level
Step-by-step guide to the two-peg test for checking optical level collimation error. Setup, rod readings, calculation, and adjustment for Topcon AT-B4, Leica NA724, and Spectra precision levels.
How to Set Grade with a Pipe Laser
Step-by-step guide to setting grade with a pipe laser for sewer and drainage installation. Elevation setup, grade entry, target reading, and accuracy verification for Topcon TP-L6G and Spectra pipe lasers.
How to Set Out Building Corners with a Total Station
Step-by-step guide to setting out building corners using a total station. Control setup, coordinate stakeout, batter board layout, and accuracy verification for Topcon GT, Trimble S-series, and Leica TS instruments.
How to Set Up Base and Rover RTK GPS for Construction
Complete workflow for setting up a base and rover RTK GPS system for construction. Covers base occupation, rover pairing, correction link, and field verification for Trimble, Topcon, and Leica.
How to Set Up Machine Control Grade on an Excavator
Machine control setup guide for excavators: GPS receiver mounting, sensor calibration, design file loading, and grade checking. For Topcon 3D-MC2 and Trimble GCS900 systems.
How to Set Up a Machine Control System on an Excavator
Step-by-step guide to setting up a machine control grade system on an excavator. Sensor installation, calibration, design file loading, and accuracy verification for Topcon X-53x, Trimble GCS900, and Leica iCON systems.
How to Set Up an RTK Base Station for Construction
Step-by-step guide to setting up an RTK GPS base station for construction surveys. Known point vs. autonomous setup, radio and cellular correction broadcast, and rover initialization for Trimble, Topcon, and Leica base stations.
How to Set Up the Topcon RL-H5A Rotary Laser
Step-by-step setup guide for the Topcon RL-H5A rotary laser: tripod placement, leveling, receiver pairing, and grade work. From Express Tools — authorized Topcon dealer.
How to Set Up the Topcon TP-L6G Pipe Laser
Complete setup guide for the Topcon TP-L6G pipe laser: manhole setup, grade entry, target alignment, and common troubleshooting. Authorized Topcon dealer guide.
How to Set Up a Total Station on a Known Point
Step-by-step guide to occupying a known control point with a total station. Centering, leveling, backsight orientation, and residual checks for Topcon, Trimble, and Leica instruments.
How to Shoot Elevations with a Digital Level
Step-by-step guide to shooting elevations with a digital level. Setup, bar-code rod reading, HI method, data recording, and accuracy verification for Topcon DL-500, Leica Sprinter, and Trimble DiNi digital levels.
How to Transfer Coordinates Between Job Files on a Data Collector
Step-by-step guide to transferring coordinates between job files on a data collector. Covers coordinate export, import methods, coordinate system matching, and verification for Trimble Access, Topcon Magnet, and Leica Captivate.
How to Transfer Elevation Across a Job Site with a Rotary Laser
Step-by-step guide to transferring elevation benchmarks across a construction site using a rotary laser. Backsight setup, height of instrument calculation, and elevation transfer for Topcon RL-H5A, Spectra LL500, and Leica Rugby.
How to Troubleshoot a GPS Rover That Won't Get a Fix
Step-by-step troubleshooting guide for GPS rovers stuck in float or autonomous mode. Satellite count, correction signal, multipath, and hardware checks for Trimble, Topcon, Leica, and Spectra GNSS rovers.
How to Use a Data Collector with a Total Station
Step-by-step guide to connecting and using a data collector with a total station for construction layout and survey. Bluetooth pairing, job setup, stakeout workflow for Trimble TSC7, Topcon FC-6000, and Leica CS20.
How to Use a Digital Level for Differential Leveling
Step-by-step guide to differential leveling with a digital level: rod readings, benchmark transfer, and closure check. For Leica, Topcon, and Sokkia digital levels.
How to Use a GPS Rover for Construction Stakeout
Step-by-step guide to GPS/GNSS rover stakeout for construction: base station setup, rover configuration, RTK initialization, and stakeout workflow. For Trimble, Topcon, and Leica rovers.
How to Use a GPS Rover for Construction Stakeout
Step-by-step guide to using a GPS/GNSS rover for construction stakeout. Point setup, RTK initialization, pole plumbing, and stakeout navigation for Trimble, Topcon, and Leica GNSS rovers.
How to Use Machine Control on an Excavator: Operator's Guide
Excavator machine control operator's guide: reading the cab display, bucket positioning, automatic dig mode, and grade verification for Topcon, Trimble, and Leica systems.
How to Use an Optical Level for Differential Leveling
Step-by-step guide to differential leveling with an optical level. HI method, turning points, closing the loop, and error tolerance for Topcon AT-B4, Leica NA724, and Spectra precision levels.

Free 30 days with every Express Tools purchase
Your equipment. Your data. All in one place.
Gradelog is the field-execution platform built for grading and earthwork crews. Log grade shots, track cut/fill, document phases with photos, and generate as-built reports — from the cab to the office.
- Grade shots & cut/fill tracking per job
- Photo documentation by phase, task, and equipment
- As-built reports ready for inspector sign-off
- AI field assistant — troubleshoot on the jobsite

Built by the same team as Express Tools
Try Free →30 days
Free trial
8 languages
Supported
iPhone + Android
Works on
